Другие журналы

электронный журнал

МОЛОДЕЖНЫЙ НАУЧНО-ТЕХНИЧЕСКИЙ ВЕСТНИК

Издатель Академия инженерных наук им. А.М. Прохорова. Эл No. ФС77-51038. ISSN 2307-0609

Решение задачи составления проектных расписаний типа «Компромисс время-стоимость»

Молодежный научно-технический вестник # 09, сентябрь 2012
Файл статьи: Сашилина К.С..pdf (606.69Кб)
автор: Сашилина К. С.

1.     Е. Tsang, Foundations of Constraint Satisfaction, Academic Press, London, 1993.

2.     A.Azaron, C.Perkgoz, M.Sakawa, A Genetic Algorithm Approach for the Time-Cost Tradeoff in PERT Networks, Applied Math. and Comput. 168(2005) 1317-1339

3.     R.T. Harvey, J.H. Patterson, An Implicit Enumeration Algorithm for the Time-Cost Tradeoff Problem in Project Network Analysis, Found. Control Eng. 4(1979) 107-117.

4.     K. Neumann, C.Schwindt, Projects with Minimal and Maximal Time Lags: Construction of Activity-on-Node Networks and Applications, Report WIOR-447, 1995.

5.     R.H. Möhring, F.J. Radermacher, The Order-Theoretic Approach to Scheduling: the Stochastic Case, Advancec in Project Scheduling, 1989, 497-531.

6.     J.H. Patterson, F.B. Talbot, An Algorithm for a General Class of Precedence and Resource Constrained Scheduling Problems, Advancec in Project Scheduling, 1989, 3-28.

7.        Mingozzi A., Maniezzo V., Ricciardelli S., Bianco L.An exact alforithm for project scheduling with recource constraints based on new mathematical formulation, Management Science. 1998. V. 44. P. 714–729.

8.        F.F. Boctor, Some Efficient Multi-heuristic Procedures for Resource-Constrained Project Scheduling, European Journal of Operational Research 49 (1990) 3-13.

9.        O. Oguz, H. Bala, A comparative study of computational procedures for the resource constrained project scheduling problem, European Journal of Operational Research 72 (1994) 406-416.

10.    D. Merkle, M. Middendorf, H. Schmeck, Ant Colony Optimization for Resource-Constrained Project Scheduling, IEEE Transactions on Evolutionary Computation, 4(2002) 33-58.

11.    S. Hartmann, A Competetive Genetic Algorithm for the Resource-Constrained Project Scheduling, Naval Research Logistics 456(1998) 733-750.

12.    T. Baar, P. Brucker, S. Knust, Tabu-Search Algorithms for Resource-Constraned Project Scheduling Problems, Annals of Operational Research 102(2001) 83-109.


Тематические рубрики:
Поделиться:
 
ПОИСК
 
elibrary crossref neicon rusycon
 
ЮБИЛЕИ
ФОТОРЕПОРТАЖИ
 
СОБЫТИЯ
 
НОВОСТНАЯ ЛЕНТА



Авторы
Пресс-релизы
Библиотека
Конференции
Выставки
О проекте
Rambler's Top100
Телефон: +7 (499) 263-61-98
  RSS
© 2003-2024 «Молодежный научно-технический вестник» Тел.: +7 (499) 263-61-98